Brand: ABB
Model: DSDO115
Origin: Switzerland
Warranty: 365 days
Quality: new/second-hand
Delivery method: express delivery
Make panel grounding
Installation tips When encountering communication problems in noisy environments or operating near temperature limits, the following recommendations should be noted. Grounding of operation panel Other installation tips 44 Grounding of operation panel 1. The installation clip of the operation panel cannot provide a reliable grounding connection between the panel and the equipment cabinet. 2. Connect a 2.5 mm2 wire between the quick connection base of the operation panel and the panel chassis. 3. Connect 6 or 4 mm2 wires or grounding braids between the panel chassis and the nearest grounding point on the door. 4. Connect a firm but short grounding braid between the door and the equipment cabinet. 5. Screw the cable onto the 24 V DC feeder. Door operation panel Ferrite core cabinet power supply 24 V DC Section 7 Additional installation prompts Ethernet connection in panel 45 6. Ferrite cores suppress interference with the 24 V feed. Two turns around the ferrite core provide four times the inhibition of one turn. Three turns around the ferrite core provide nine times the suppression of one turn.